Nawiri AI All demos
Nawiri AI  ·  Drawing Revision & Code Compliance Scan

Every drawing set in sync, every submission compliant

Drop in the latest sheet issue and the county's own checklist. Out-of-sync revisions between architect, engineer, and site, and compliance gaps before you submit, get flagged automatically. Click a flag to see exactly why, then decide yourself.

01 Coordinate the set

One sheet, one current revision, across every discipline

Every revision issued gets checked against what the structural engineer and the contractor are actually building from. When a sheet falls out of sync, it's flagged before it becomes an RFI.

Drawing Set
ProjectKileleshwa Grove, 14-Unit Apartment Development
Set No.Issue 6
DisciplineArchitectural · Structural · MEP
Requested byMwangi & Odero Architects
Cross-checking revision numbers against structural engineer and site copies…
Sync check complete, review each mismatch below 0 of 2 mismatches resolved
A-102Ground Floor Plan
Architect · Rev D Structural · Rev D Site · Rev C
A-401Elevations & Sections
Architect · Rev C Structural · n/a Site · Rev B
S-201Foundation & Column Layout
Architect · Rev B Structural · Rev B Site · Rev B
In sync
A-501Window & Door Schedule
Architect · Rev E Structural · n/a Site · Rev E
In sync
M-301Plumbing & Drainage Layout
Architect · Rev A Structural · n/a Site · Rev A
In sync
02 Check it against code

Every county requirement, checked before you submit

Cross-checked against Nairobi City County Development Control guidelines, NEMA screening criteria, and NCA registration prerequisites, not caught by a rejection letter six weeks later.

Pre-submission review complete, review each flag below 0 of 4 checkpoints reviewed
Development Application: Kileleshwa Grove, 14-Unit Apartment Development
County Physical Planning · Pre-Submission Compliance Review
Zoning & Density
Proposed floor area gives a plot ratio of 2.4:1 against Kileleshwa's zoned maximum of 1.75:1 under the current Nairobi City County zoning guide.
Parking Provision
14 units at the standard 1.5 bays/unit requires 21 parking bays, the current site plan provides only 16.
Accessibility
Ground floor entrance shows a 450mm kerb step with no ramp alternative.
Fire Safety
The fire tender turning-radius calculation is not yet attached to the site plan.
Submission package: title deed/lease ✓ · official search (<3 mo) ✓ · survey map ✓ · architectural drawings ✓ · structural drawings & calculations, pending engineer's stamp · NCA project registration, not yet filed · rates clearance certificate ✓
03 Behind the scenes

Every project, tracked the same way

Not just one set of drawings, every project moving through the practice gets the same coordination and compliance check, so nothing slips between disciplines or through a submission gap.

Revision conflicts caught per week, illustrative example of what your dashboard would show

Wk 1 Wk 2 Wk 3 Wk 4 Wk 5 Wk 6
23
Conflicts caught this week
+667%
vs. week 1

Average non-billable coordination hours per week, illustrative example, not live data

Wk 1 Wk 2 Wk 3 Wk 4 Wk 5 Wk 6
-75%
Coordination time, Wk 1 → Wk 6
$2,800
Avoided delay cost, per week
04 Escalation, not silence

Every walkthrough decision logged, the big ones always confirmed by you

Site-visit conversations get turned into a dated decision log automatically. High-stakes changes always come back to you for sign-off, only routine, repeated choices are trusted to log themselves.

Structural & budget-impacting changes62 flagged this quarter · 0 auto-confirmed, ever
Always escalated
Scope additions & schedule changes89 flagged this quarter · always routed to a written change order first
Always escalated
Routine finish selections (tile, paint, hardware)214 logged this quarter · 0 ever needed re-confirmation
Auto-logged
01

One current revision, everywhere

Architect, structural engineer, and site all building from the same sheet, always. Stale revisions get caught before they become rework, not an RFI three weeks later.

02

Compliant before you submit

Checked against zoning, plot ratio, parking, accessibility, and fire access before the package goes to County Physical Planning, not caught in the rejection letter.

03

Nothing said on a walkthrough gets lost

Every site-visit decision logged and dated. Structural and scope changes always come back to you for sign-off, routine finish choices don't need to.